CivPoint — Independent Engineering Assurance
PROJECTS

Work delivered for the UK's Tier 1 contractors.

Residential towers, RC frames and industrial ground-bearing slabs across the West Midlands — each one inspected against its specification, with the record to show for it.

JOHN SISK & SONGRAHAMBOWMER + KIRKLANDGLENCAR
Moda raft foundation reinforcement with cast-in drainage, sheet piling and ducts before the pourPROFILE 01
Residential£300mJohn Sisk & Son

Moda, Great Charles Street

Birmingham, United Kingdom
The challenge

A landmark £300m residential development in central Birmingham, where quality and safety had to be controlled across every groundwork activity — from temporary works and below-ground drainage through to finishing and handover.

Our role

Full-time QA/QC management, supervision and inspection of the groundworks: reviewing technical designs to resolve issues before they reached site, supervising temporary works and drainage installations, managing finishing and handover, and mentoring junior engineers.

What we delivered
QA/QC management & inspectionDrainage & temporary works supervisedFinishing & handover managedHealth & safety compliance
The Crown Works, Birmingham, with mast climbers on the brick facade and GRAHAM hoarding at street levelPROFILE 02
Residential£40mGRAHAM

The Crown Works

Birmingham, United Kingdom
The challenge

A £40m multi-storey residential scheme needing full-time supervision through its most critical phases — the whole groundworks package and part of the reinforced concrete frame.

Our role

Full-time supervision and quality inspection, keeping the works to specification and making sure safety requirements were followed throughout.

What we delivered
Groundworks supervisedRC frame inspectionSpecification compliance
Finished fibre-reinforced power-floated slab inside the Jaguar Land Rover warehouse, SolihullPROFILE 03
Industrial£1m FRC slabGlencar

Jaguar Land Rover warehouse

Solihull, United Kingdom
The challenge

A £1m fibre-reinforced concrete ground-bearing slab, specified to tight tolerances for a hard-working industrial environment.

Our role

End-to-end QA/QC of the slab — verifying materials, monitoring placement and finishing, and checking the finished floor against the specified strength, durability and tolerance.

What we delivered
FRC slab QA/QCMaterial & placement checksTolerance verification
Aerial view of a completed Spark logistics unit with its service yard, Walsall
Service yard and cladding of a Spark unit at sunset
Steel portal frame and finished power-floated slab inside a Spark warehouse
Aerial view of a Spark unit from the rear, with the Birmingham skyline beyond
PROFILE 04
Industrial & logistics£100mBowmer + Kirkland

Spark, Walsall

Walsall, United Kingdom
The challenge

A £100m, 620,000 ft² logistics and manufacturing development delivered in phases, with several units under construction at once.

Our role

Engineering and quality management across the phases — checking setting-out, levels and specification compliance against the design.

What we delivered
Phased QA/QCLevels & setting-out verifiedInspection records for handover
ALSO
Worcester Six Business Park£7m industrial unit · Glencar · QA & supervision
Unity & Armouries, BirminghamResidential · Dandara Living

Your project could be the next one on this page.

Request a proposal